Our Achievement Highlights
2010
After certification, ANE installed series of domestic electrical installation works, ranging from 3-bedroom flats, duplex and other commercial buildings.
2011
Electrical installation of PVC extrusion plants, including cooling tower circulation system, chemical mixers, PVC lumps recycling machine and installation of 8ooA capacity distribution panel and power cabling, Kaduna State.
Electrical installation of lead & aluminium recovery dust collector funnels with control panels, running of power and control cables with cables scheduled, fabrications of cable trays and ladders and modification of their existing imported MCC Panels, Ogun State.
2012
Service partnership engagement with CNL (Conveyancer Nig. Limited) for subcontracting projects from their multinational clients.
Electrical repair & services of 4 Wheel Niffy Equipment at Nigeria Brewery Lagos State.
2013
Design and building of automatic diesel distribution control panels and installation at Access Bank Head Quarter Ikoyi, Lagos State. Redesign, build and replace newly control for an existing 15 tons double hoists over-head crane at Nigeria Brewery Lagos State.
2014
Design and building of electrical control panel for overhead sewage treatment plant at Protea Hotel Ikoyi Westworld, Lagos State.
AMASAPPHIRE (NIG.) ENTERPRISES was officially registered and fully incorporated under the CAC as an electrical service company, which gave us more confidence in terms of reliability and strong service business.
2015
Repair and troubleshooting of DC operated mobile boom lift equipment at Nigeria Brewery, Ogun State.
2016
Design and building of electrical control panel for swimming pool circulation pumps, incorporated with an automatic voltage regulator, underwater swimming pool lighting and other electrical installation works, Lagos State.
2017
Installation of 1,600A capacity motorized automatic transfer switch (ATS), configured with l000KVA transformer, 1,000 and 800KVA diesel generator sets selection for automatic power source change over, Ogun State. Complete wiring of Sachet/bottle water production factory, machines installations and powering, 400A capacity low voltage distribution panel installation, cable running, termination, earthing and commissioning, Lagos State.
2018
Built and Installed low voltage distribution panels of 630A, 400A and 250A capacities
respectively, Lagos State.Designed and built standard electrical control panels for water treatment plants,
Lagos State.Built and Installed manually operated change over switch, incorporated with low voltage
distribution panel with instrumentation, Lagos State.Built and installed 2000A capacity medium voltage distribution panel, Ogun State.
Upgrade the existing 16ooA capacity ATS to 2000A.2019
Built and Installed 16ooA capacity manually Operated change over switch for diesel/gas power supply, Ogun State
Built and installed low voltage distribution panels, Ogun State.
Electrical Installation of gas plant facility, running of cables, power and control auxiliary panels, earthing and cables terminations, Ogun State.
Built and Installed 400A capacity semi- automatic change over panel, Lagos State